Internationally patented formwork bracing
Set out once. Pour 500 times.
Reusable bracing that replaces timber edge forms. One tradesman sets it out with a standard formie kit. Made in Australia.
Shop the bracket range
-
EdgePro BaseEdge 300 (P)
Fixed 90 degree polymer slab-edge bracket, up to 300mm
- Engineered Polymer Composite
- MOQ 20
From $60.00 ex GST
-
EdgePro FlexEdge 600 (P)
Adjustable polymer slab-edge bracket, up to 600mm
- Engineered Polymer Composite
- MOQ 20
From $120.00 ex GST
-
Pre-orderEdgePro MaxEdge 1200 (S)
Heavy-duty adjustable steel bracket, up to 1200mm
- Structural Steel
- MOQ 20
From $180.00 ex GST
-
Pre-orderEdgePro RebateEdge Wall 450 (S)
Wall-mounted rebate bracket for slab overhangs and rebates
- Structural Steel
- MOQ 20
$80.00 ex GST
-
Pre-orderEdgePro RebateEdge Slab 450 (S)
Adjustable steel rebate bracket for slab rebates and nib walls
- Structural Steel
- MOQ 20
$60.00 ex GST
Meet the FlexEdge 600, our most popular bracket.
The bracket more crews order than any other in the EdgePro lineup. Follow the numbered points, or tap one, to see why every part earns its place on site.
Anchor it to anything
-
EdgePro FixEdge StarPeg Anchor (S)
$12.00 ex GST
-
EdgePro FixEdge Ground Screw Anchor (S)
$18.00 ex GST
-
EdgePro FixEdge Concrete Bolt M12 (S)
$4.00 ex GST
-
EdgePro FixEdge Z-Bar Concrete Bolt M12 (S)
$18.00 ex GST
-
EdgePro FixEdge Z-Bar Locknut (S)
$12.00 ex GST
The system that pays for itself on the first pour.
Timber bracing gets cut once and thrown away. EdgePro gets stripped, stacked in the stillage and sent to the next pour. The spend hits the books once, not every slab.
-
Standard formie kit
Hammer drill, rattle gun, impact driver. Nothing exotic, nothing hired.
-
Outlives pallets of timber
Engineered polymer and steel, built for the job after this one.
-
12-month warranty
Across the whole range, brackets to stillages.
-
Made in Australia
Designed and manufactured here for Australian site conditions.
From backyard sheds to $26B infrastructure.
$26.1B
ACCIONA
North East Link
$1.5B
John Holland
Gold Coast Light Rail Stage 3
$1.33B
Armadale Line Upgrade Alliance
Byford Rail Extension
$5M
SRD Concrete
Cairns Stadium
$400K
Zac Haslem Concreting
Warwick Industrial Shed
RAAF
Royal Australian Engineers
Remote community builds via RAAF Base Amberley
In their words
Crews who have run it on real jobs.
-
We have been using Edgepro formwork solutions for several years now and they have been a game-changer for our business. The reduction in time and materials has not only saved us money, but it has allowed us to take on more projects and increase our bottom line. We highly recommend Edgepro to anyone in the construction industry looking to improve their processes and increase efficiency.
Kaidawn Construction
Spring Sciences grow facility · Perseverance water main upgrade · Lismore water and sewage treatment plant
-
We've been using Edgepro Formwork Solutions for years and the results have always been impressive. The adjustable formwork brace has been a game changer and saved us time and money on every project. Its versatility means it can be used on a range of applications, and the fact that it's virtually indestructible and produces no waste makes it even better. It helps keep the site clean and tidy, and we've never had to replace one. Highly recommend.
Hughes Developments & Electrical
Flagstone PDA development (QLD Government)
-
We're proud to have chosen Edgepro Formwork Solutions for the construction of the Pearl Tower in Main Beach. The project required innovative and efficient formwork systems, and Edgepro delivered outstanding results. Their products saved us time and money while ensuring a high-quality finish. We highly recommend Edgepro to anyone in the construction industry.
Raptis Group
Pearl, Main Beach
-
Using Edgepro formwork solutions has been a game changer for us at Mitchell Marine Constructions. The ease of use, particularly when working in marine environments, has saved us significant time and money. We appreciate the quality and durability of the product, which has allowed us to complete projects with confidence. We highly recommend Edgepro formwork solutions to anyone in the construction industry looking for efficient and reliable formwork solutions.
Mitchell Marine Constructions
Guyatt Park ferry terminal, Brisbane 2019 (QLD Government) · Queens Wharf Casino concrete boardwalk, Brisbane 2020 (Multiplex) · Stuart’s Point boat ramp, NSW 2021
For the next pour
Buying for the job in front of you?
Brackets, fixings and storage, priced ex GST, shipped from South East Queensland. Order online in minutes, no phone calls required.
For major projects
Supplying a site that measures in kilometres?
Volume pricing, NET 30 trade accounts and project support for contractors. Tell us about the project and a real person replies within one business day.
Common questions
Are your prices ex GST?
Yes. Prices across the site are ex GST, and GST is added at checkout. That is the standard convention for trade supply in Australia.
How many times can the brackets be reused?
The system is engineered for roughly 500 or more uses per bracket. Polymer and steel that keeps fronting up long after timber is landfill.
What is the warranty?
12 months across the whole range, from brackets to stillages.
Do I need special tools to install it?
No. A standard formie kit covers it: hammer drill, rattle gun, impact driver.
Where do you ship from?
From our warehouse in South East Queensland, Australia-wide.